(Please enter english or number.)

Reconstruction of Sammyo Senior Middle School, Kangso District

(2021.1.5.)

(Prepared Plans)

Project title: Support to the school construction for the children in Sammyo-ri

Objective: To pull down old single-storied school buildings and construct a new building large enough to seat up to 450 students and good enough to serve as a standard in the rural areas.

Number of beneficiaries: Some 450 students and 45 teachers of Sammyo Senior Middle School

Period of Implementation: April 2021-August 2022

Content: KEF, in cooperation with special construction companies, shall confirm necessary technical matters including the designing, schedule of construction and supply of building materials by special items and arrange the provision of labour force while giving precedence to the supply of building materials.

The total floor space of a 3-storied building will be 3 000㎡ and it is planned to carry out heat insulation jobs for the foundation, inner and outer walls and roof to prevent a damage from a heavy rain and snow and cold weather.

To keep the rooms warm and well ventilated—especially in winter—double-glazed and plastic-framed windows and air-tight and damp proof strong entrance doors are to be installed.

Additionally, a new water supply and sewage system will be constructed, and indoor and outdoor washrooms will be built so that the students and teachers will not have any inconvenience.

KEF supports the construction of 5-6 schools on a yearly basis in cooperation with several entities. It has good experience in coordinating such projects.

 

For more information, please use the following e-mail address: hanshuosy@126.com